Call(812) 844-5518
Stack of new pine lumber, ends showing (representative photo)

Deck and fence services in Salem, INSix kinds of work. One crew.

New decks and old ones, wood fences and wire ones, the gates in them and the tear-out before them.

Representative photo

The part you never see

Built from the frost line up.

Every deck and fence goes through these six steps, most of them below the grass. Scroll, and the drawing builds itself.

A deck and a fence, drawn from the frost line up Example drawing, not to scale. It builds as you scroll: buried lines marked by Indiana 811, a string line laid out, holes dug below the frost line, posts set, the deck framed and the fence railed, then boards, pickets and a winter frost that pushes up while the posts hold. FROST LINE HOUSE GAS LINE, MARKED INDIANA 811 STRING LINEDECK LAYOUT BELOW THE FROST LINE AUGER PIERSET PLUMB LEDGERJOISTSBEAMLEVEL RAILS FROST PUSHES UP. POSTS BELOW IT STAY PUT. BUILT TO STAND
1Call 811Example drawing, not to scale
  1. STEP 01

    Call 811 first

    Indiana 811 marks buried lines before anyone digs. Little flags in the yard show where they run, and the holes stay clear of them.

  2. STEP 02

    String the line

    Stakes and a tight string set the fence line and the deck edge. Every hole gets marked off that string, so the run stays straight.

    Marking a cut (representative photo)
    Marking a cut (representative photo)
  3. STEP 03

    Dig below the frost line

    Holes go down past the depth where the ground freezes. A post that stops short gets lifted by the frost and starts to lean.

  4. STEP 04

    Set the posts

    Posts go in plumb and set solid. Deck posts stand on brackets above the concrete, so the end grain stays out of the water.

    New posts on a rebuild in progress
    New posts on a rebuild in progress
  5. STEP 05

    Frame it square

    Ledger, joists and beam for the deck. Rails for the fence. Square, level and plumb get checked before a single board goes on.

    Cedar joists on a frame the crew built
    Cedar joists on a frame the crew built
  6. STEP 06

    Boards, rails, then winter

    Boards, stairs and rails go on last, then the pickets. Come January the frost pushes up from below, and the posts stay put.

    A finished covered deck the crew built
    A finished covered deck the crew built

From the first call

How a job runs.

  1. Call or text

    Tell Mike what you want built and where. A photo or a sketch of the spot helps.

  2. Mike comes out

    He looks, measures, checks the ground and talks through wood, composite or metal.

  3. Lines and layout

    Buried lines get marked by Indiana 811. Then the layout gets strung tight.

  4. The build

    Posts, frame, boards and gates, built square and plumb by the crew.

  5. Walk it together

    The crew cleans up and you walk the finished job with Mike.

Where we work

Salem first. Then down the road.

Home base is Salem, in Washington County. The crew takes jobs in the towns around it and south to New Albany on the Ohio.

Map of real driving routes from Salem, Indiana to Pekin, Palmyra, Borden, Scottsburg, Paoli, Corydon and New Albany, with county lines and the Ohio River OHIO RIVERKENTUCKYWASHINGTON CO.ORANGE CO.SCOTT CO.CLARK CO.FLOYD CO.HARRISON CO.Salem · home basePekin · 16 minPalmyra · 22 minBorden · 25 minScottsburg · 31 minPaoli · 36 minCorydon · 44 minNew Albany · 48 min

Real driving routes from the Washington County Courthouse in Salem.

Get a quote

Tell Mike what you want built.

Send the job, the town and a good number to reach you.

Mike gets back to you to set a time to look and measure.

Salem Deck and Fence badge: a picket fence in a circle, Salem Deck & Fence, 812-844-5518, Salem, IN

Request a quote

Mike calls or texts you back. Your number is not shared with anyone.

Call or TextGet a Quote